Head of ACS and Instrumentation Department

Specializations:
  • Other

Employment: full time

Work schedule: full day

Work experience 21 year 4 months

April 2020currently
5 years 3 months
"Inter – RAO Engineering" LLC
Instrumentation and ACS specialist
- Technical supervision on the gas turbine power plant construction project. - Engineering coordination of ACS and automation systems. - Interaction with engineering institutes and equipment suppliers. - Preparation of technical specifications and participation in the formation and contracts approval for the implementation of construction and installation, commissioning, equipment supply and material and technical resources. - Timely release and project working documentation production. - Control of contractor’s work, its compliance to the approved projects and technical conditions, as well as the approval of acts to pay for these works. - Control over the fulfillment of the state supervisory authorities and designer supervision instructions by contractors. - Preparation of reports on project implementation - Control and development of programs for testing equipment and automation systems. - Participation in operational meetings and monitoring the implementation of decisions made. - Providing the automation systems availability for Individual and complex testing of technological equipment. - The transfer of systems into operation.
December 2016November 2019
3 years
"Sibur" OS
Мanager of ACS Department
- Management and general organization of the commissioning group and ACS activities on the West Siberian complex for deep processing of hydrocarbon raw materials (HC) into polyolefins with a capacity of 2.0 million tons per year with the corresponding off-site facilities. - Management of organizing and carrying out commissioning work on ACS systems, signaling and warning systems, data collection and transmission systems, ensuring readiness for performance tests of technological units. - The development of programs and plans for commissioning. Coordination and presence organization of equipment suppliers during the period of commissioning. - Checking the contractor’s completing of work within the deadlines. - Coordination of all parties involved in the implementation of the project (design, construction and installation, commissioning organizations, suppliers and equipment manufacturers). - Development of a contractual strategy, necessary to close all volumes of work including ensuring the implementation of commissioning. - Developing of technical specifications for the supply of materials. Organization of the Contractors selection. The control of the terms of performance under the Contracts. - Detection of design collisions, creating of technical solutions to allow the equipment to be put into operation with the provision of design indicators. The release control of these decisions by the design institute. - Organization of complex tests and equipment commissioning.
June 2016December 2016
7 months
“FORTUM”, OS
The head of ASC, Instrumentation and low-current network
- The technical supervision of the project, equipment selection, installation, and commissioning works in ASC, Instrumentation and low-current networks. - Coordination of work from writing the Terms of Reference to putting it into commercial operation in such areas as: ACS, dispatch control and data collection systems, automated information and measurement systems for commercial accounting, monitoring systems for technological and electrical equipment, equipment Instrumentation, security and fire alarm systems, communication networks, video surveillance. - General group management, identification and setting of priorities. - The development of directive schedules for the implementation of key project tasks. - Ensuring the approved monthly schedule for the development of funds. - Development and adoption of technical solutions for unifying, rationalizing and improving the quality of commissioning and further operation of equipment methods, together with design, installation, commissioning organizations. - Coordination of contractors' actions to meet the deadlines for the directive schedule for putting the equipment into operation. Projects: Design, installation and commissioning, automation of engineering networks at the construction project of three power units CCGT-247.5 MW at Chelyabinsk power plant.
April 2015June 2016
1 year 3 months
“FORTUM”, OS
Deputy head of the control group in the direction of APCS, instrumentation and automation and low-current network
- Functions of technical supervision in terms of instrumentation, control system and process control system on the project for the construction of three power units CCGT-247.5 MW. - Organization of the work control group in the direction of instrumentation and automation and low-current networks. - Technical supervision over the timely and high-quality implementation of design work in terms of the selection of main and auxiliary equipment at the stage of Design documentation and Working documentation, in terms of the developed documentation as applied to a specific technological control object. - Development and adoption of technical solutions aimed at improving the installation quality, commissioning, equipment operation and optimization of the technological process together with the General Design Organization and Equipment Suppliers. - Development of technical specifications for the design, supply, installation, commissioning in terms of process control systems, instrumentation and low-current system. - Technical support of contracts at the stage of concluding and performing work. - Supervision over the compliance of the Working Documentation with the approved Design Documentation. - Supervision of compliance with the rules and technical conditions for the implementation and acceptance of installation, commissioning and special works. - The examination and execution of certificates for hidden and special works. - Coordination of actions of equipment suppliers and contracting design, installation, commissioning organizations within their competence. - Coordination of the activities of the Customer's technical supervision services, field supervision and other project participants. - Control of the timeliness issue of working documentation to contractors and changes to it. - Coordination of contractors in terms of timely equipment delivery, implementation of plans and schedules of installation and commissioning works in accordance with priority areas. - Implementation of the work organization of claims to designers, manufacturers, organizations, equipment suppliers and performers of work. - Interaction with supervisory authorities, suppliers, partners and contractors. - Participation in operational meetings both with contractors and with partners and company management. - Organization and coordination the transfer of equipment into Operation.
March 2013April 2015
2 years 2 months
“FORTUM”, OS
ACS and Instrumentation engineer
Technical supervision functions in terms of instrumentation and control systems for the construction project of three power units CCGT-247.5 MW. - Technical supervision over the high-quality execution of design work in terms of the selection of main and auxiliary equipment at the stage of Design documentation and Working documentation in the direction of APCS, instrumentation. - Adoption of technical solutions aimed at improving the quality of equipment operation together with the General Design Organization and Equipment Suppliers. - Supervision over the compliance of the Working Documentation with the approved Design Documentation. - Supervision of compliance with the rules and technical conditions for the implementation and acceptance of installation, commissioning and special works. - Participation in the survey and execution of certificates for hidden and special works. - Coordination of equipment suppliers actions and contracting design, installation, commissioning organizations within their competence. -Participation in the development of schedules for construction and installation work and commissioning. - Control of the issue of working documentation to contractors and changes to it. - Requirement from contractors to fulfill plans and schedules of installation and commissioning works.
July 2008February 2013
4 years 8 months
“Ivelectronaladka” OS
Commissioning and testing engineer category
The analysis of the working project of the APCS: - in terms of field instrumentation and control equipment (assessment of the accuracy of the choice of measurement tools and methods). - in part of switching equipment of automation systems. - in terms of interfacing instrumentation and automation equipment with software and hardware complex (conformity of installation of measuring channels, control and signaling circuits to design documentation). - in terms of instrumentation and equipment management with the development of measures and proposals to eliminate the identified deficiencies; - writing a conclusion based on the results of the analysis. Formation of applications for the purchase of missing instrumentation and automation equipment to carry out work on the project. Laboratory verification and calibration of primary measuring instruments, metrological certification of measuring channels. Control over the implementation of installation work, in terms of instrumentation and according to the project documentation. Acceptance from installation of field equipment of the APCS. "Cold" and "Hot adjustment" of the field equipment of the automated process control system with information output to the control room (adjustment of the subsystem for collecting, processing and displaying information, control and signaling circuits). Start-up, unit-by-unit and complex commissioning of instrumentation and automation equipment. Technical support of instrumentation and automation equipment during the operating period adjustments. Projects: Implementation of a complex of commissioning of instrumentation and control equipment for SIEMENS V94.2 gas turbines (4 power unit of CHPP-27 OJSC "MOSENERGO", 2 power unit of Kaliningradskaya CHPP-2), General Electric Frame 9E (PG9171E) Novomoskovskaya GRES, General Electric MS5001PA Vankor GTESN.
November 2007July 2008
9 months
branch of the Federal State Unitary Enterprise of the Rosenergoatom Concern Balakovo Nuclear Power Plant
Turbine Operations Engineer
Analysis and control over the operation of the serviced heat and power equipment. Drawing up work schedules, orders, applications, instructions, explanatory notes, technological maps, diagrams and other technical and technological documentation. Supervision and control over the condition and operation of technological equipment, identification of reserves, determination of the causes of existing deficiencies and malfunctions in the operation of equipment, taking measures to eliminate them and increase the efficiency of use. Participation in the development and implementation of emergency and firefighting drills. Pre-start tests, verification of automatic transfer switch, technological protection, and interlocks of thermal mechanical equipment, hydrotesting of technological equipment.
November 2003November 2007
4 years 1 month
branch of the Federal State Unitary Enterprise of the Rosenergoatom Concern Balakovo Nuclear Power Plan
Turbine department operator
Operational maintenance of the main and auxiliary thermal-mechanical equipment of the turbine compartment of a VVER-1000 NPP power unit: steam turbine K-1000-60 / 1500-2, its main elements (piping, bearings, steam distribution system, lubrication, hydraulic lifting of the rotor, electrohydraulic and hydraulic regulation, condensing unit); turbine feeding unit OK-12A; pumping units: - centrifugal; - gear; - plunger; - piston; heat exchangers (single-pass, multi-pass, horizontal, vertical): - shell-and-tube surface type; - lamellar; heaters, ejectors, filters, safety devices, shut-off and control valves. Maintaining the specified operating mode, starting-stopping operation, withdrawing equipment for repair (from repair), to reserve (from reserve), routine maintenance.

Skills

Skill proficiency levels
Работоспособность

Higher education

2003
Ivanovo State Power Engineering University
Engineering and physica, Energy Engineer

Languages

RussianNative


EnglishA1 — Basic


GermanA1 — Basic


Citizenship, travel time to work

Citizenship: Russia

Permission to work: Russia

Desired travel time to work: Doesn't matter